In compliance with ERC Resolution No. 08, Series of 2023, "A Resolution Adopting the Procurement Guidelines for the Regulated Transmission and Distribution Assets of Regulated Entities".
| Materials or services to be procured | Invitation to Bid | Submit Letter of Intent by |
Status |
| Wireless Microphone |
2025-075
Bid Bulletin 2025-075-1 | 2025-10-27 | |
| Installation of Distribution Transformer, Primary and Secondary Line Extension with Line Revamp | 2025-074 | 2025-10-24 | |
| 69kV Disconnect Switch |
2025-073 Bid Bulletin 2025-073-1 Bid Bulletin 2025-073-2 |
2025-10-17 | |
| Projector Screen | 2025-072r | 2025-10-14 | Concluded |
| Projector Screen | 2025-072 | 2025-10-10 | Concluded |
| Construction of Library and Mini Museum |
2025-071 Bid Bulletin 2025-071-1 |
2025-10-13 | Concluded |
| Installation of Fire Detection and Alarm System (FDAS) | 2025-070r | 2025-10-02 | Concluded |
| Installation of Fire Detection and Alarm System (FDAS) | 2025-070 | 2025-09-30 | Concluded |
| Firefighting Gears and Equipment | 2025-069r | 2025-10-02 | Concluded |
| Firefighting Gears and Equipment | 2025-069 | 2025-09-30 | Concluded |
| Installation of Distribution Transformer, Secondary Line Extension with Line Revamp | 2025-068r | 2025-10-08 | Concluded |
| Installation of Distribution Transformer, Secondary Line Extension with Line Revamp | 2025-068 | 2025-09-25 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line extensions with Line Revamp | 2025-067r | 2025-10-06 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line extensions with Line Revamp | 2025-067 | 2025-09-23 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2025-066 | 2025-09-05 | Concluded |
| Server Data Cabinet | 2025-065 | 2025-08-26 | Concluded |
| Patch Panel | 2025-064 | 2025-08-26 | Concluded |
| Ethernet Cable | 2025-063 | 2025-08-26 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-062 Bid Bulletin 2025-062-1 |
2025-08-26 | Concluded |
| Geographic Information System | 2025-061r | 2025-09-22 | Concluded |
| Geographic Information System | 2025-061 | 2025-09-03 | Concluded |
| Single Phase Distribution Transformers | 2025-060 | 2025-08-08 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-059 Bid Bulletin 2025-059-1 |
2025-08-06 | Concluded |
| I-Meter AMR System | 2025-058r | 2025-08-10 | Concluded |
| I-Meter AMR System |
2025-058 Bid Bulletin 2025-058-1 |
2025-07-21 | Concluded | Installation of Distribution Transformers, Line Extension and Line Revamp |
2025-057 Bid Bulletin 2025-057-1 Bid Bulletin 2025-057-2 |
2025-07-03 | Concluded |
| Lightning Protection System |
2025-056 Bid Bulletin 2025-056-1 Bid Bulletin 2025-056-2 |
2025-07-02 | Concluded |
| Network Video Recorder | 2025-055 | 2025-06-24 | Concluded |
| Wireless Access Point | 2025-054 | 2025-06-24 | Concluded |
| Dot Matrix Printer | 2025-053 | 2025-06-24 | Concluded |
| Server Class Machines |
2025-052 Bid Bulletin 2025-052-1 |
2025-06-24 | Concluded |
| Line tools and equipments |
2025-051r | 2025-06-20 | Concluded |
| Line tools and equipments | 2025-051 | 2025-06-18 | Concluded |
| Portable and Two-way Digital Radio | 2025-050r | 2025-06-10 | Concluded |
| Portable and Two-way Digital Radio | 2025-050 | 2025-06-07 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-049 Bid Bulletin 2025-049-1 |
2025-05-30 | Concluded |
| Projector |
2025-048 Bid Bulletin 2025-048-1 |
2025-05-15 | Concluded |
| Distribution Line Trimming and Clearing Works |
2025-047 Bid Bulletin 2025-047-1 |
2025-05-07 | Concluded |
| Disconnect Meter Sleeves | 2025-046r | 2025-05-10 | Concluded |
| Disconnect Meter Sleeves | 2025-046 | 2025-05-02 | Concluded |
| Various Electrical Wires/Overhead Conductors | 2025-045r | 2025-05-10 | Concluded |
| Various Electrical Wires/Overhead Conductors | 2025-045 | 2025-05-02 | Concluded |
| Meter Seal |
2025-044 Bid Bulletin 2025-044-1 Bid Bulletin 2025-044-2 |
2025-05-02 | Concluded |
| GI Fence Tube | 2025-043r | 2025-05-06 | Concluded |
| GI Fence Tube |
2025-043 Bid Bulletin 2025-043-1 |
2025-04-30 | Concluded |
| Liquid Tight Straight Connector, Bushing, Locknut and Electrical Tape | 2025-042r | 2025-05-06 | Concluded |
| Liquid Tight Straight Connector, Bushing, Locknut and Electrical Tape |
2025-042 Bid Bulletin 2025-042-1 |
2025-04-30 | Concluded |
| Test Block Switch |
2025-041 Bid Bulletin 2025-041-1 Bid Bulletin 2025-041-2 |
2025-04-30 | Concluded |
| Low Voltage Current Transformer | 2025-040 | 2025-04-28 | Concluded |
| Medium Voltage Current Transformer and Potential | 2025-039 | 2025-04-28 | Concluded |
| Procurement of Round Meter Socket with Slip Lock Ring | 2025-038 | 2025-04-28 | Concluded |
| Supply and Installation of PVC Folding Door, Window Blinds and Sofas for Bacayao Control Tower Extension | 2025-037r | 2025-04-23 | Concluded |
| Supply and Installation of PVC Folding Door, Window Blinds and Sofas for Bacayao Control Tower Extension | 2025-037 | 2025-04-21 | Concluded |
| Stainless Meter Slip-Lock Sealing Ring | 2025-036 | 2025-04-23 | Concluded |
| Contracted Services For Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-035 Bid Bulletin 2025-035-1 |
2025-04-23 | Concluded |
| CT-Rated Polyphase Electricity Meters | 2025-034 | 2025-04-23 | Concluded |
| Single Phase Electricity Meters | 2025-033 | 2025-04-23 | Concluded |
| Computer Tablet |
2025-032 Bid Bulletin 2025-032-1 |
2025-04-15 | Concluded |
| Monochrome Laser Printer |
2025-031 Bid Bulletin 2025-031-1 |
2025-04-14 | Concluded |
| Outdoor Current Transformer Cabinet |
2025-030 Bid Bulletin 2025-030-1 |
2025-04-07 | Concluded |
| Rectangular Meter Socket |
2025-029 Bid Bulletin 2025-029-1 |
2025-04-07 | Concluded |
| CT-Rated Polyphase Electricity Meters | 2025-028 | 2025-04-07 | Concluded |
| Polyphase Self-Contained Electricity Meters | 2025-027r | 2025-04-16 | Concluded |
| Polyphase Self-Contained Electricity Meters | 2025-027 | 2025-04-07 | Concluded |
| CT-Rated Polyphase Electricity Meters | 2025-026r | 2025-04-16 | Concluded |
| CT-Rated Polyphase Electricity Meters | 2025-026 | 2025-04-07 | Concluded |
| Single Phase Electricity Meters | 2025-025 | 2025-04-07 | Concluded |
| Lenovo Laptop | 2025-024 | 2025-03-27 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2025-023 | 2025-03-21 | Concluded |
| Wires | 2025-022r | 2025-04-04 | Concluded |
| Wires |
2025-022 Bid Bulletin 2025-022-1 |
2025-03-18 | Concluded |
| Wire Conductors | 2025-021r | 2025-04-04 | Concluded |
| Wire Conductors |
2025-021 Bid Bulletin 2025-021-1 |
2025-03-18 | Concluded |
| Streetlights |
2025-020r Bid Bulletin 2025-020r-1 |
2025-03-27 | Concluded |
| Streetlights | 2025-020 | 2025-03-17 | Concluded |
| Insulators |
2025-019r Bid Bulletin 2025-019r-1 |
2025-03-27 | Concluded |
| Insulators | 2025-019 | 2025-03-17 | Concluded |
| Pole Line Hardware |
2025-018r Bid Bulletin 2025-018r-1 Bid Bulletin 2025-018r-2 |
2025-03-27 | Concluded |
| Pole Line Hardware |
2025-018 Bid Bulletin 2025-018-1 |
2025-03-14 | Concluded |
| Pole Line Hardware | 2025-017r | 2025-03-18 | Concluded |
| Pole Line Hardware |
2025-017 Bid Bulletin 2025-017-1 |
2025-03-14 | Concluded |
| Line Equipment and Accessories | 2025-016r | 2025-03-26 | Concluded |
| Line Equipment and Accessories | 2025-016 | 2025-03-13 | Concluded |
| Electrical Tapes | 2025-015r | 2025-03-26 | Concluded |
| Connectors and Electrical Tapes | 2025-015 | 2025-03-13 | Concluded |
| Connectors | 2025-014r | 2025-03-26 | Concluded |
| Connectors | 2025-014 | 2025-03-13 | Concluded |
| Steel Poles | 2025-013 | 2025-03-12 | Concluded |
| Concrete Poles |
2025-012 Bid Bulletin 2025-012-1 |
2025-03-12 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-011 Bid Bulletin 2025-011-1 |
2025-02-21 | Concluded |
| One Brand New Truck Mounted Telescope Crane | 2025-010 | 2025-02-21 | Concluded |
| Design and Construction of Chief Operating Officer (COO) and Legal Offices | 2025-009 | 2025-02-17 | Concluded |
| Line Tools and Equipment | 2025-008-1r | 2025-03-20 | Concluded |
| Line Tools and Equipment | 2025-008-1 | 2025-03-10 | Concluded |
| Line Tools and Equipment | 2025-008r | 2025-03-03 | Concluded |
| Line Tools and Equipment |
2025-008 Bid Bulletin 2025-008-1 |
2025-02-14 | Concluded |
| Supply and Installation of Air Conditioning Units (ACU) for Bacayao Control Tower Extension | 2025-007r | 2025-02-11 | Concluded |
| Supply and Installation of Air Conditioning Units (ACU) for Bacayao Control Tower Extension | 2025-007 | 2025-02-10 | Concluded |
| Keyboard |
2025-006r Bid Bulletin 2025-006r-1 |
2025-02-07 | Concluded |
| Data Storage Device, Rack Mount Server Case, Keyboard, HDMI Connector, Media Converter and DIN rail Power Supply | 2025-006 | 2025-01-27 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-005 Bid Bulletin 2025-005-1 |
2025-01-17 | Concluded |
| Single Phase Electricity Meters | 2025-004 | 2025-01-17 | Concluded |
| San Jacinto Field Office Renovation | 2025-003 | 2025-01-16 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2025-002 Bid Bulletin 2025-002-1 |
2024-12-13 | Concluded |
| Single Phase Distribution Transformers | 2025-001 | 2024-12-09 | Concluded |
| Unmanned Aerial Vehicle (UAV) with Thermal Camera |
2024-065r | 2024-12-23 | Concluded |
| Unmanned Aerial Vehicle (UAV) with Thermal Camera |
2024-065 Bid Bulletin 2024-065-1 |
2024-12-17 | Concluded |
| Line Tools and Equipment |
2024-064 Bid Bulletin 2024-064-1 |
2024-12-05 | Concluded |
| San Miguel PNR Road Area Regravelling | 2024-063r | 2024-12-05 | Concluded |
| San Miguel PNR Road Area Regravelling | 2024-063 | 2024-12-03 | Concluded |
| Civil Works/ Concreting of Road Portion of SBSS Construction Project | 2024-062 | 2024-12-03 | Concluded |
| One Brand New Isuzu Dmax LT 4x2 MT Model 2024 | 2024-061r | 2024-12-05 | Concluded |
| One Brand New Isuzu Dmax LT 4x2 MT Model 2024 and One Brand New Isuzu Traviz L UV Model 2024 | 2024-061 | 2024-11-22 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-060 Bid Bulletin 2024-060-1 |
2024-11-21 | Concluded |
| Trimming. Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-059-1 | 2024-11-14 | Concluded |
| Trimming. Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-059 Bid Bulletin 2024-059-1 |
2024-11-14 | Concluded |
| Line Tools and Equipment | 2024-058r | 2024-11-18 | Concluded |
| Line Tools and Equipment | 2024-058 | 2024-11-13 | Concluded |
| VFL Conference Hall Improvement |
2024-057 Bid Bulletin 2024-057-1 |
2024-10-21 | Concluded |
| Construction of Two Storey Control Room Building Extension and Refurbishment of the Old Tower Building |
2024-056 Bid Bulletin 2024-056-1 |
2024-10-21 | Concluded |
| Construction of Covered Structure |
2024-054-055 Bid Bulletin 2024-054-055-2 |
2024-10-11 | Concluded |
| Construction of Covered Structure |
2024-055 Bid Bulletin 2024-054-055-1 |
2024-10-11 | Concluded |
| Bacayao Lot Extension Development Project |
2024-054 Bid Bulletin 2024-054-055-1 |
2024-10-11 | Concluded |
| Bacayao Cottages Area Rehabilitation Project |
2024-053 Bid Bulletin 2024-053-1 |
2024-10-11 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-052 Bid Bulletin 2024-052-1 |
2024-10-03 | Concluded |
| Toyota Innova Model 2024 | 2024-051r | 2024-09-27 | Concluded |
| Toyota Innova Model 2024 | 2024-051 | 2024-09-24 | Concluded |
| Network Switch | 2024-050r | 2024-10-07 | Concluded |
| Network Switch | 2024-050 | 2024-09-24 | Concluded |
| Network IP Camera | 2024-049r | 2024-10-07 | Concluded |
| Network IP Camera | 2024-049 | 2024-09-24 | Concluded |
| Laptop | 2024-048r | 2024-10-07 | Concluded |
| Laptop | 2024-048 | 2024-09-24 | Concluded |
| Current and Potential Transformer Tester |
2024-047 Bid Bulletin 2024-047-1 |
2024-09-23 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-046 Bid Bulletin 2024-046-1 |
2024-09-16 | Concluded |
| Service Vehicle | 2024-045 | 2024-09-10 | Concluded |
| Laboratory Equipment – Power Quality Analyzer |
2024-044r Bid Bulletin 2024-044r-1 |
2024-09-24 | Concluded |
| Laboratory Equipment – Power Quality Analyzer | 2024-044 | 2024-09-10 | Concluded |
| Lot Backfilling | 2024-043r | 2024-09-13 | Concluded |
| Lot Backfilling | 2024-043 | 2024-09-10 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-042 Bid Bulletin 2024-042-1 |
2024-09-02 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-041 Bid Bulletin 2024-041-1 |
2024-08-21 | Concluded |
| Dot Matrix Printers and Network Cables | 2024-040r | 2024-08-21 | Concluded |
| Dot Matrix Printers and Network Cables | 2024-040 | 2024-08-16 | Concluded |
| Brand New Toyota Hilux Model 2024 | 2024-039r | 2024-07-30 | Concluded |
| Brand New Toyota Hilux Model 2024 | 2024-039 | 2024-07-25 | Concluded |
| Brand New Suzuki S-Presso Model 2024 and Suzuki Carry UV Model 2024 |
2024-038 Bid Bulletin 2024-038-1 | 2024-07-25 | Concluded |
| Replacement of VFL Second Floor Quarters Damaged Wood Floors to Tiles | 2024-037 | 2024-07-22 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-036 Bid Bulletin 2024-036-1 Bid Bulletin 2024-036-2 |
2024-08-01 | Concluded |
| External Hard Drive | 2024-035 | 2024-06-30 | Concluded |
| Line Tools and Equipment | 2024-034r | 2024-07-11 | Concluded |
| Line Tools and Equipment | 2024-034 | 2024-06-30 | Concluded |
| Digital Two-Way Mobile Radios and Portable Radio | 2024-033r | 2024-07-11 | Concluded |
| Digital Two-Way Mobile Radios and Portable Radio | 2024-033 | 2024-06-30 | Concluded |
| Line Tools and Equipment | 2024-032 | 2024-06-21 | Concluded |
| Line Tools and Equipment | 2024-031 | 2024-06-21 | Concluded |
| Line Tools and Equipment | 2024-030r | 2024-07-11 | Concluded |
| Line Tools and Equipment | 2024-030 | 2024-06-21 | Concluded |
| Line Tools and Equipment | 2024-029 | 2024-06-21 | Concluded |
| Line Tools and Equipment | 2024-028r | 2024-07-08 | Concluded |
| Line Tools and Equipment | 2024-028 | 2024-06-21 | Concluded |
| Optical Time Domain Reflectometer | 2024-027r | 2024-06-21 | Concluded |
| Optical Time Domain Reflectometer | 2024-027 | 2024-06-17 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-026 Bid Bulletin 2024-026 |
2024-06-17 | Concluded |
| Primary Line Extension with Line Revamp | 2024-025 | 2024-05-22 | Concluded |
| 69kV Line Construction of Balingueo – Macabito – San Miguel Line |
2024-024 Bid Bulletin 2024-024 |
2024-05-22 | Concluded |
| Customer Accounting Section (CAS) Office Partition |
2024-023 Bid Bulletin 2024-023 |
2024-05-22 | Concluded |
| Concreting of Bacayao Vehicle Wash Area | 2024-022 | 2024-05-22 | Concluded |
| Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-021 | 2024-05-14 | Concluded |
| Streetlight | 2024-020 | 2024-05-08 | Concluded |
| Line Equipment and Accessories | 2024-019r | 2024-06-10 | Concluded |
| Line Equipment and Accessories | 2024-019 | 2024-05-08 | Concluded |
| Insulators |
2024-018r Bid Bulletin 2024-018-1 Bid Bulletin 2024-018-2 |
2024-07-08 | Concluded |
| Insulators |
2024-018 Bid Bulletin 2024-018-1 Bid Bulletin 2024-018-2 |
2024-06-26 | Concluded |
| Pole Line Hardware | 2024-017r | 2024-06-02 | Concluded |
| Pole Line Hardware | 2024-017 | 2024-04-29 | Concluded |
| Connectors and Electrical Tape | 2024-016r | 2024-06-10 | Concluded |
| Connectors and Electrical Tape | 2024-016 | 2024-04-29 | Concluded |
| Concrete and Steel Poles | 2024-015r | 2024-06-02 | Concluded |
| Concrete and Steel Poles | 2024-015 | 2024-04-29 | Concluded |
| Wire Conductors | 2024-014r | 2024-06-02 | Concluded |
| Wire Conductors | 2024-014 | 2024-04-29 | Concluded |
| Wireless Access Point | 2024-013r | 2024-05-08 | Concluded |
| Wireless Access Point | 2024-013 | 2024-04-18 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-012 | 2024-04-14 | Concluded |
| Trimming | 2024-011 | 2024-04-02 | Concluded |
| Current Transformer and Potential Transformer | 2024-010 | 2024-04-02 | Concluded |
| Polyphase Electricity Meters | 2024-009r | 2024-04-24 | Concluded |
| Polyphase Electricity Meters | 2024-009 | 2024-04-02 | Concluded |
| Single Phase Electricity Meters | 2024-008 | 2024-04-02 | Concluded |
| Various Metering Accessories | 2024-007r | 2024-04-29 | Concluded |
| Various Metering Accessories | 2024-007 | 2024-03-24 | Concluded |
| Line Tools and Equipment | 2024-006r | 2024-04-29 | Concluded |
| Line Tools and Equipment | 2024-006 | 2024-03-20 | Concluded |
| Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-005 | 2024-03-14 | Concluded |
| Wire Conductors and Cables | 2024-004r | 2024-03-26 | Concluded |
| Wire Conductors and Cables | 2024-004 | 2024-03-14 | Concluded |
| Single Phase Distribution Transformers | 2024-003r | 2024-03-25 | Concluded |
| Procurement of Single Phase Distribution Transformers | 2024-003 | 2024-03-10 | Concluded |
| Trimming under 69 KV Sub-Transmission Line | 2024-002r | 2024-03-15 | Concluded |
| Trimming | 2024-002 | 2024-02-29 | Concluded |
| Installation of Distribution Transformers and Primary Line Extension with Secondary Line Extension | 2024-001r | 2024-03-13 | Concluded |
| Installation of Distribution Transformers and Primary Line Extension with Secondary Line Extension |
2024-001 Bid Bulletin 2024-001 |
2024-02-22 | Concluded |