In compliance with ERC Resolution No. 08, Series of 2023, "A Resolution Adopting the Procurement Guidelines for the Regulated Transmission and Distribution Assets of Regulated Entities".
Materials or services to be procured | Invitation to Bid | Submit Letter of Intent by |
Status |
Pole Line Hardware | 2024-017 | 2024-04-29 | |
Connectors and Electrical Tape | 2024-016 | 2024-04-29 | |
Concrete and Steel Poles | 2024-015 | 2024-04-29 | |
Wire Conductors | 2024-014 | 2024-04-29 | |
Wireless Access Point | 2024-013 | 2024-04-18 | Concluded |
Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-012 | 2024-04-14 | Concluded |
Trimming | 2024-011 | 2024-04-02 | Concluded |
Current Transformer and Potential Transformer | 2024-010 | 2024-04-02 | |
Polyphase Electricity Meters | 2024-009 | 2024-04-02 | |
Single Phase Electricity Meters | 2024-008 | 2024-04-02 | Concluded |
Various Metering Accessories | 2024-007r | 2024-04-29 | |
Various Metering Accessories | 2024-007 | 2024-03-24 | |
Line Tools and Equipment | 2024-006r | 2024-04-29 | |
Line Tools and Equipment | 2024-006 | 2024-03-20 | |
Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-005 | 2024-03-14 | Concluded |
Wire Conductors and Cables | 2024-004r | 2024-03-26 | Concluded |
Wire Conductors and Cables | 2024-004 | 2024-03-14 | Concluded |
Single Phase Distribution Transformers | 2024-003r | 2024-03-25 | Concluded |
Procurement of Single Phase Distribution Transformers | 2024-003 | 2024-03-10 | Concluded |
Trimming under 69 KV Sub-Transmission Line | 2024-002r | 2024-03-15 | Concluded |
Trimming | 2024-002 | 2024-02-29 | Concluded |
Installation of Distribution Transformers and Primary Line Extension with Secondary Line Extension | 2024-001r | 2024-03-13 | Concluded |
Installation of Distribution Transformers and Primary Line Extension with Secondary Line Extension |
2024-001 Bid Bulletin 2024-001 |
2024-02-22 | Concluded |